Sign in or register

My Eezglobal

My shopping cart

   
Business & Industrial> Mixing Machine> Mixer Disperser Emulsifying Machine>
022709:High-shear emulsifying pump pipeline Single Stage Pipeline
Unit:
Set
Price:
1,415.00$
Weight:
52.40kg
QTY:
     

Similar products

022482:High-shear emulsifying pump pipeline Single Stage Pipeline(110V,1.5KW)

022704:New Emulsion pump High Shear Emulsifying Pump 110V 2.2KW

181211:WRL-140 High Shear Homogenizer

181042:1.5KW,220V High Shear Mixer Disperser Emulsifying Machine Emulsion

181011:4kw 220V High Shear Mixer Disperser Emulsifying Machine Emulsion

New Emulsion Pump High Shear Emulsifying Pump 110V 2.2KW

Product Overwiew
The High Shear Emulsifying Pump is an efficient emulsifying device, is mainly used for continuous and professional production and is suitable for various industrial fields with fine emulsification requirements. The device can achieve uniform dispersion and emulsification of materials, is small in size, simple in structure, high in efficiency, easy to operate and long in service life, and can be widely applied to the fields of biological medicine, food, cosmetic care, ink coating, nano-materials, petrochemical, printing and dyeing auxiliaries, paper making, pesticides and chemical fertilizers, plastics, rubber and other fine chemical mixing, dispersion and emulsification.
Product Parameters
Power 2.2KW
Voltage 110V
Frequency 60HZ
Speed 2900r/min
Flow range 0-3m3/h
N-d φ4-16mm
Inlet 38mm
Outlet 32mm
Material stainless steel 304
https://topseller365.com/data/prd/022/709/chicun.jpg
Product Features

Stainless Steel Material

 

  • Food-grade stainless steel
  • Reach the food hygiene level
  • Surface polishing treatment
  • Rust and corrosion resistance
     

Premium Pump Head

 

  • Adopt precise machining
  • Without liquid residues
  • Detachable pump head design
  • Convenient to disassemble and clean
     
 

Protective Cover

 

  • Wrap and protect the motor
  • Prevent liquid from splashing
  • Not prone to rusting and corrosion
  • Prolong the service life of the motor
     
 

Inlets and Outlets

 

  • Inlets and outlets with different functions
  • Ensure smooth circulation of liquid
  • Adopt clamp connection and fixing
  • Flexible to fix and loosen
     
 
https://topseller365.com/data/prd/022/709/bnm.jpeg
Attention
1. Check whether the inlet seal and the outlet seal are good, and no impurities, metal chips and other materials that can cause damage to the equipment enter the body.
2. Check whether the motor and the machine are in good conditions when the machine is transported to leave the warehouse. When the power switch is connected, a safe contact motor device should be installed.
3. Before inlet and outlet process pipelines are connected, the process pipelines are cleaned, and it is ensured that the process pipelines are free of welding slag, metal chips, glass chips, quartz sand and other things which can cause damage to the equipment, and the process pipelines can be connected with the machine after being connected with the hard materials.
4. The installation position of the TRL1 pipeline equipment and the nearest location of the container can be selected such as the bottom of the container. The pipeline must be simple and direct, and the components of the elbow pipe are reduced as many as possible, thus reducing the resistance of the material in the circulation process.

5. The choice of location for intermittent equipment installation is suitable for the vertical level of container. When the machine topples over, it must be well sealed, moisture-proof, dust-proof and explosion-proof.

6. Before starting the machine, rotate the spindle, feel the height and flexibility with two hands, and determine no other frictional sound and abnormal sound.
7. When the pipelines are installed, the inlet and outlet pipes adopt the hoop electric connection structure.
8. After the above work is finished, the power supply is connected, and the steering shaft of the motor is checked repeatedly.
Maintenance
1. The cooling water is usually connected before the machine is started, and the cooling water is closed and then can be used.
2. The cooling water pressure is less than 0.2Mpa.
3. The material must enter the working chamber, and the machine can be switched on. It is also necessary to ensure that it does not run in the condition of material failure, so that idling and mechanical sealing are avoided. (A current protector is added when the emulsion pump is connected, so that burnout or the bad influence on the service life is avoided.)
4. A current protector is added when the emulsion pump is connected.
Important Note
After the sealing of the cooling water is confirmed, the motor is started, and the motor steering should be operated according to the steering sign of the main shaft, and the reversal is strictly prohibited!
It cannot be Idle and Reverse!!!!! (You must pay attention to it.)
Product Display
 
Item Number (022709): 1 * New Emulsion Pump High Shear Emulsifying Pump 110V 2.2KW

You can make order with no worry.
Any concern just feel free to let us know, we'll reply in 24 hours in normal condition.
Handling Time: Shipping is usually made in 1-3 business days after payments cleared. Orders are processed from Monday-Friday; Not on the weekends & public holidays.
Warranty: 6 months' warranty for the machines, not for the consumables.
We stand behind our products all the item, so even if your warranty period has expired, you can still seek for service or technical support from us with low cost.

无标题文档

About Us Product Service Shipping Payment Privacy refund Warranty

Copyright eezglobal.com All Rights Reserved