| 01. To reserve enough installation space, the 
				distance between the pre-filter and the wall is greater than 
				80mm. 02. The water pressure is required to be 
				greater than 0.1 Mpa, and the distance between the water pipe 
				and the ground must be more than 400mm.  03. Reserve water inlet and outlet pipes, 
				sewage pipes and floor drains according to the corresponding 
				machine installation diagram. 04.A protective sleeve made of PP material has 
				been added to prevent the filter element from shaking left and 
				right. When removing, it can be preheated with hot water before 
				being removed. |